INDIANA-BASED · CONSTRUCTION & INFRASTRUCTURE

Complex projects.
Clear execution.

I'm Patrick Booth, a construction and utility coordination professional connecting field realities, project schedules, stakeholders, and better operating systems.

Patrick Booth at the Eiffel Tower in Paris
PATRICK BOOTH / CONSTRUCTION & INFRASTRUCTUREField experience. Practical coordination. Better systems.
7+YEARS IN CONSTRUCTION
50+CONCURRENT UTILITY PROJECTS HANDLED
INDOTCERTIFIED UTILITY COORDINATOR
OSHA 30CURRENT SAFETY TRAINING
01 / THE APPROACH

Technical details matter.
So does the big picture.

My career connects roadway and bridge construction, preconstruction utility coordination, telecommunications, security systems, and military electronics. Those experiences taught me to translate technical constraints into work plans that field crews, project teams, and stakeholders can act on.

I take a practical approach to project delivery: identify constraints early, document decisions clearly, keep stakeholders aligned, and build systems that make deadlines and responsibilities visible.

Construction coordinationUtility relocationProject documentationProcess improvement
02 / CAPABILITIES

Where I contribute.

Hands-on construction oversight, utility coordination, telecommunications, technical operations, and systems work across multiple industries.

01
↗

Construction delivery

Field coordination, plan interpretation, construction sequencing awareness, quantity tracking, contractor communication, and issue resolution.

02
⌁

Utility coordination

Stakeholder outreach, utility conflict tracking, relocation schedules, milestone monitoring, and INDOT coordination processes.

03
▤

Project controls

RFIs, change-order review, reporting, document management, schedule visibility, and organized project records.

04
⌘

Operational systems

Excel/VBA tools, Access databases, workflow automation, status dashboards, and repeatable reporting processes.

03 / CAREER PATH

From the field to
program-level coordination.

A practical career path across technical operations, outside-plant communications, field construction, and multi-project infrastructure coordination.

2026

Utility Coordinator

American Structurepoint

Led utility coordination across more than 50 concurrent transportation projects. Coordinated utility owners and project teams, tracked notices and verification, assessed conflicts, and organized work plans, deadlines, and project correspondence.

2022

Resident Project Representative

SJCA, Inc.

Oversaw day-to-day INDOT roadway and bridge construction assignments, coordinated inspectors and contractors, facilitated progress meetings, and managed field reporting, RFIs, change orders, quantities, and pay items.

2019

Construction Inspector

SJCA, Inc.

Inspected roadway and bridge work against plans and specifications; documented activities, materials, methods, installed quantities, and field issues.

2018

Security Systems Installation & Service

Koorsen Fire & Security and earlier firm

Installed, programmed, serviced, and troubleshot alarm, video surveillance, and access-control systems.

2017

Regional Electronics Technician

Net-Tel Communications

Provided regional electronics and technical support, bringing hardware troubleshooting and systems knowledge to field-oriented service work.

2012

Technical Liaison / Network Support

Watch Communications

Technical liaison and network-support work involving customer connectivity, service troubleshooting, and internal systems. Also created a revised payroll-tracking process to reduce administrative friction.

2012

Outside Plant Engineer

SEFNCO Communications

Supported telecommunications outside-plant engineering, municipal permitting, and right-of-way coordination in the Seattle area.

2008

Electronics Technician, E-5

United States Navy

Maintained and troubleshot communications and secure communications equipment, including encryption hardware, in a security-conscious operational environment.

04 / SELECTED CONTRIBUTIONS

The work behind
the job titles.

Specific examples from construction, utility coordination, technology service, and operational improvement.

01 / SCALE

Coordinating 50+ active infrastructure projects

Maintained visibility across simultaneous transportation assignments, owner correspondence, INDOT notices, utility verifications, conflict assessment, work plans, and overlapping deadlines.

AMERICAN STRUCTUREPOINT · UTILITY COORDINATION

02 / FIELD DELIVERY

Bridging the field and the project team

As an inspector and resident project representative, documented work against plans, followed quantities and pay items, and coordinated RFIs, change orders, inspection staff, contractors, and progress meetings.

SJCA · ROADWAY & BRIDGE CONSTRUCTION

03 / OPERATIONS

Turning scattered records into working systems

Built and improved spreadsheets, automated correspondence preparation, reporting workflows, and tracking systems to reduce manual administrative work and make responsibilities easier to see.

CONSTRUCTION ADMINISTRATION & PROCESS DESIGN

04 / EARLY AUTOMATION

Reworking a payroll-tracking process

Redesigned and implemented a payroll tracking workflow at Watch Communications, an early example of improving how an organization captures and uses operational data.

WATCH COMMUNICATIONS · TECHNICAL SUPPORT

05 / INFRASTRUCTURE

Outside-plant engineering and permitting

Supported outside-plant telecommunications design coordination, municipal permitting, and right-of-way workflows for Seattle-area infrastructure projects.

SEFNCO COMMUNICATIONS · TELECOMMUNICATIONS

06 / TECHNICAL FOUNDATION

Maintaining complex electronics in demanding settings

Military electronics work included component-level troubleshooting, secure communications equipment, and technical procedures; civilian work continued into networks, security systems, and electronics service.

U.S. NAVY & CIVILIAN TECHNICAL ROLES

05 / REPRESENTATIVE ASSIGNMENTS

Selected projects. Real responsibilities.

A selection of assignments showing different coordination challenges, from expanded project scope and design milestones to construction administration and field troubleshooting.

01 / ASSIGNMENTBRIDGE INTERFACE REVIEW
INDOT · BRIDGE / UTILITY COORDINATION

SR 157 bridge improvements

Utility coordination for bridge work where facilities near structures, approaches, and construction limits required a focused design-stage review.

Focus and contributions
  • Compared bridge and approach plans against available utility information to identify where facilities warranted closer review.
  • Organized owner verification and design-team questions by facility and location instead of relying on a general project-level status.
  • Kept potential relocation needs and outstanding responses visible ahead of successive project-development milestones.
02 / ASSIGNMENTSCOPE AND CHANGE MANAGEMENT
DES 2000027 · CORRIDOR DEVELOPMENT

US 33 corridor · Goshen / Elkhart

An added-scope corridor assignment requiring disciplined change tracking as the limits, affected facility owners, and correspondence evolved.

Focus and contributions
  • Tracked newly introduced scope alongside existing utility correspondence so prior responses were not mistaken for coverage of added work.
  • Mapped outstanding verification requests and affected facility owners to the developing corridor scope.
  • Kept the status of notices, conflict reviews, and follow-up requests organized for the expanded assignment.
03 / ASSIGNMENTINTERSECTION GEOMETRY AND CONFLICTS
DES 2301095 · INTERSECTION IMPROVEMENT

SR 46 / Huntersville roundabout

A roundabout project where the intersection footprint and utility occupancy needed to be considered together before roadway construction.

Focus and contributions
  • Reviewed utility coordination needs around the planned roundabout footprint, approaches, and potential work limits.
  • Focused communications on facility presence and design-stage information needed to evaluate potential conflicts.
  • Tracked unresolved owner responses so design discussions could distinguish known conditions from questions requiring verification.
04 / ASSIGNMENTDRAINAGE AND EXCAVATION INTERFACES
DES 2200507 · DRAINAGE STRUCTURES

SR 227 culvert work

Drainage-structure improvements where excavation limits and the location of buried or overhead facilities drive early utility coordination.

Focus and contributions
  • Organized potential conflicts around culvert sites and the utility facilities potentially affected by excavation or drainage improvements.
  • Followed up on facility verification and records needed to inform the design team before construction.
  • Kept location-specific utility questions tied to notices and coordination deadlines for the culvert assignment.
05 / ASSIGNMENTCONSTRUCTION-FOOTPRINT SCREENING
DES 2300123 · ROADWAY REHABILITATION

I-265 pavement replacement

Pavement rehabilitation work where utility coordination had to remain proportional to the actual construction footprint and its interfaces.

Focus and contributions
  • Reviewed roadway information for utility interfaces that could affect pavement work rather than assuming every nearby facility required relocation.
  • Routed facility-related questions to the appropriate utility owners and project designers.
  • Maintained a clear log of responses and decisions as the work moved through design-stage reviews.
06 / ASSIGNMENTPRELIMINARY FIELD CHECK READINESS
INDOT · PRELIMINARY FIELD CHECK

SR 32 roundabout

Preliminary Field Check-stage coordination, with emphasis on getting utility-owner input and open questions in front of the project team at the right time.

Focus and contributions
  • Prepared and monitored the correspondence and deliverables associated with the PFC milestone.
  • Consolidated facility-owner feedback and highlighted unanswered questions requiring follow-up.
  • Organized the next notices and coordination actions to support progression toward subsequent design stages.
07 / ASSIGNMENTMULTI-PROJECT COORDINATION
INDOT · MULTI-SITE ASSIGNMENT

SR 213 / SR 26 project bundle

Bundled assignments that required individual project histories, contacts, deadlines, and conflicts without losing the common program view.

Focus and contributions
  • Kept utility ownership, scope, and deliverables separated by individual site while tracking the bundle as a coordinated workstream.
  • Used structured records to distinguish a site-specific outstanding response from a package-wide deadline.
  • Maintained parallel follow-up lists to reduce the risk of correspondence or milestone obligations being overlooked.
08 / ASSIGNMENTBRIDGE AND WATERWAY INTERFACES
DES 22004992 · BRIDGE / DRAINAGE

SR 7 / Brush Creek improvements

Bridge and drainage work requiring targeted utility verification around structural and waterway-adjacent improvement limits.

Focus and contributions
  • Reviewed the utility questions raised by the available bridge and roadway design information.
  • Coordinated requests for owner verification and supporting facility information relevant to the improvement footprint.
  • Kept open conflicts and responses organized for subsequent project-development decisions.
09 / ASSIGNMENTCONSTRUCTION FIELD LEADERSHIP
SJCA · CONSTRUCTION INSPECTION / RPR

INDOT roadway and bridge construction

Progression from construction inspector to Resident Project Representative, working on active INDOT roadway and bridge construction rather than preconstruction design coordination.

Focus and contributions
  • Documented daily contractor operations, installation methods, materials, and installed quantities against project plans and specifications.
  • As RPR, coordinated inspector coverage and worked with the project engineer and contractor on RFIs, change orders, schedule issues, and field decisions.
  • Led or supported progress meetings, quantity and pay-item verification, and reporting needed to keep construction administration current.
10 / ASSIGNMENTTECHNICAL TROUBLESHOOTING
FIELD TECHNICAL SERVICES

Security & communications systems

Hands-on technical service experience across alarm, video surveillance, access control, and communications equipment.

Focus and contributions
  • Installed, configured, serviced, and troubleshot electronic security equipment in operating customer environments.
  • Worked from device-level symptoms through wiring, communications, configuration, and system-operation issues.
  • Communicated findings and next steps directly to customers while supporting reliable system operation.
06 / MY PROJECT MANAGEMENT SOFTWARE

One command center.
No spreadsheet scavenger hunts.

When a construction team is managing projects through a patchwork of Excel trackers, Outlook reminders, and disconnected email threads, valuable time disappears into status checks and administrative rework.

That's why I developed my own Utility Coordination Command Center: a proprietary project-management system designed around the day-to-day realities of transportation and utility coordination. It brings projects, utility owners, milestone deadlines, conflicts, work plans, correspondence, assigned responsibilities, and reporting into one organized workspace.

I build tools around the way teams actually work, with the goal of giving project managers and coordinators an operational system they can use instead of maintaining yet another collection of spreadsheets. The interactive preview below lets you explore the approach using realistic fictional projects.

Explore my Command Center ↗
BEFORE / FRAGMENTED TRACKING

Information scattered across tools

  • Separate spreadsheets for project statuses and utility contacts
  • Follow-ups buried in Outlook mail and reminders
  • Deadline and ownership questions answered by manual cross-checks
AFTER / CENTRALIZED WORKFLOW

A single operational picture

  • One record for each project, utility, conflict, and milestone
  • Assigned tasks and due dates alongside supporting correspondence
  • Searchable status and reporting views for coordinators and managers
07 / TOOLS & SPECIALTIES

How I deliver the work.

Practical capabilities, organized by the problems I solve and the work products I deliver.

01 / PROJECT DELIVERY

Construction administration

Field reporting, plan and specification review, quantity tracking, RFIs, change orders, contractor coordination, schedule reviews, and progress meetings.

Typical outputs Daily inspection records · Pay-item and quantity tracking · Decision / issue logs
02 / PRECONSTRUCTION

Utility & stakeholder coordination

Utility-owner outreach, verification requests, conflict tracking, relocation planning interfaces, notices, work plans, and milestone follow-through across multiple active assignments.

Typical outputs Coordination logs · Owner response registers · Deadline and work-plan tracking
03 / SYSTEMS & ANALYSIS

Tracking, automation & reporting

Excel/VBA, Microsoft Access, structured recordkeeping, data cleanup, correspondence workflows, and purpose-built project software to reduce manual status chasing.

Typical outputs Dashboards · Standardized reports · Contact databases · Workflow tools
04 / DIGITAL FIELD TOOLS

Plans, schedules & mapping

Bluebeam Revu, Microsoft Project, Excel, Outlook/Teams, Google Earth/KMZ, document control, and organized project correspondence across field and office teams.

Typical outputs Markup and review workflows · Schedule views · Spatial references · Project files
05 / TECHNICAL OPERATIONS

Telecommunications & electronics

OSP infrastructure and municipal permitting exposure, communications support, security system installation and programming, and hardware/network troubleshooting.

Typical outputs Technical service records · Installation coordination · Troubleshooting
06 / COLLABORATION

Clear responsibilities and next actions

Connecting agency staff, contractors, designers, inspectors, utility owners, and project management around decisions that need owners, deadlines, and traceable follow-up.

Typical outputs Meeting actions · Status communications · Escalation and follow-through
08 / TRAINING & CREDENTIALS

Documented training.
Practical application.

Selected education and manufacturer training certificates, organized by relevance to infrastructure project delivery and technical operations.

CURRENT / ESTABLISHED

INDOT Certified Utility Coordinator

Credential earned April 2026, supporting transportation project utility coordination in Indiana.

COMPLETED / SAFETY

OSHA 30-Hour Training

Completed construction safety training.

Project management & scheduling

Training in project management, integration, and scheduling.

2020PM COURSE

Project Management Foundations

LinkedIn Learning · April 17, 2020

Project management fundamentals

2020PM COURSE

Project Management Foundations: Schedules

LinkedIn Learning · June 25, 2020

Schedule fundamentals and project planning

2020PM COURSE

Project Management Foundations: Integration

LinkedIn Learning · April 27, 2020

Integrating activities and project work

2020PM COURSE

Microsoft Project 2019 & Project Online Desktop

LinkedIn Learning · April 27, 2020

Scheduling software training

Construction inspection & materials qualifications

Previously held field inspection and materials testing credentials supporting INDOT roadway and bridge construction.

PREVIOUSLY HELD

INDOT Construction Inspector

Construction inspection procedures, documentation, and compliance with plans and specifications.

PREVIOUSLY HELD

INDOT Certified Technician

INDOT construction materials and field quality-control procedures.

PREVIOUSLY HELD

ACI Concrete Field Testing

Concrete sampling and field testing fundamentals for construction quality verification.

PREVIOUSLY HELD

INDOT HMA / Asphalt

Hot-mix asphalt construction materials, inspection, and testing practices.

PREVIOUSLY HELD

INDOT Concrete

Concrete construction, placement, and quality considerations for transportation work.

PREVIOUSLY HELD

Stormwater & Erosion Control

Construction stormwater practices, erosion prevention, and field compliance.

PREVIOUSLY HELD

ATSSA Work Zone Traffic Control

Temporary traffic control and work-zone safety principles.

Historical technical & manufacturer training

Technical training in surveillance systems, networking, and access control.

TECHNICAL TRAINING

Wisenet Device Configuration: Networking

Wisenet · Historical coursework

Network configuration for video surveillance

TECHNICAL TRAINING

Wisenet Device Configuration: Cybersecurity

Wisenet · Historical coursework

Security considerations for connected devices

TECHNICAL TRAINING

XR150/550 Access Control Basics

DMP · Historical coursework

Access-control panel training

TECHNICAL TRAINING

Milestone Fundamentals of IP Surveillance Systems

Milestone · Historical coursework

IP surveillance system foundations

09 / LET’S CONNECT

Good projects need
clear coordination.

Open to the right project management, construction coordination, utility coordination, and operations-improvement opportunities in Indiana or remote.

CONTACT
LOCATIONKnightstown, IndianaIndianapolis metro / Indiana-eligible remoteDownload resume (PDF) ↓Download editable Word version ↓